Every construction project is highly complex. We have solid experience with all kinds of construction – roadways,
commercial offices, educational facilities, warehouses and convention centers. Our attention to detail and ability
to manage subcontractors and craftsmen give you the edge.


Whether your project calls for one structure or a group of diverse
structures, which could include both roadways and buildings,
you can rely on our skilled professionals to manage every piece
of your package. From massive marine structures to buildings
to roadways, make one call to complete your project’s needs.

Silent Unity Building Unity, Missouri
This 78,000 SF, three story Mediterranean style building at Unity Village, Missouri provides new administrative and data facilities; a 24/7 call center; a 350 seat chapel with a new Wicks pipe organ; and a smaller chapel for 24 hour prayer services. The project also includes service tunnels connecting the new building  to the existing building and to the Unity seven story landmark tower.

Bartle Hall Expansion Kansas City, Missouri
To open an additional 83,000 SF of convention space, twenty two concrete columns had to be removed.  To accomplish this drilled shafts were installed, new concrete columns constructed and 6’ 6” steel truss frames erected, all within a confined area which had only 33’ of working head room and a short 45 week completion schedule.

Bruce Watkins Expressway — Kansas City, Missouri
This project featured three miles of new four and six lane wide roadway sections, separated with an architectural median planter wall.  The concrete for the 14 inch thick pavement was produced at Massman’s on-site, 450 CY/HR batch plant.

I-35 Highway Widening —Olathe, Kansas
Massman widened 3.25 miles of north and south bound Interstate I-35 near Olathe, Kansas.  The project also included construction of seven bridge structures including a five span structure over railroad tracks.  This work was performed without a major disruption to the over 50,000 vehicles which travel this section of highway on a daily basis.